Close Menu
AfroCaribbean Tv
  • Home
  • Live TV
  • Live Radio
  • Blog
  • General
  • Africa
    • Nigeria
    • AutoBiography
    • Lifestyle
  • Caribbean
    • Trinidad and Tobago
  • About
  • Contact
Facebook X (Twitter) Instagram
Tuesday, January 13
  • Lifestyle
  • General
  • Business
Facebook X (Twitter) LinkedIn VKontakte
AfroCaribbean Tv
Banner
  • Home
  • Live TV
  • Live Radio
  • Blog
  • General
  • Africa
    • Nigeria
    • AutoBiography
    • Lifestyle
  • Caribbean
    • Trinidad and Tobago
  • About
  • Contact
AfroCaribbean Tv
Home » Blog » FG considers lagoon backfilling to replace 3km bridge on Lekki Deep Seaport access road
General

FG considers lagoon backfilling to replace 3km bridge on Lekki Deep Seaport access road

Dejo RichardsBy Dejo RichardsNovember 24, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The Federal Government has said it is considering filling a non-flowing lagoon to replace a 3-kilometre bridge on the ongoing Lekki Deep Seaport–Epe–Ijebu-Ode access road.The Minister of Works, David Umahi, made the disclosure during an inspection of the project on Sunday.

He added that the project is on course for completion within 21 Umahi noted that the Federal Government, China Harbour Engineering Company (CHEC) — the contractor handling the project — Dangote Group, and the Lagos State Government are holding discussions to redesign that section of the project.

“The Federal Government says the 25km access road linking Lekki Deep Seaport to Epe and Ijebu-Ode will be delivered within its 21-month schedule. “The government described the project as highly viable and fully on course. The Minister of Works, Sen. Dave Umahi, gave the assurance during an inspection of the road project in Lagos on Sunday.The report added, “On challenges being addressed, Umahi said discussions were ongoing with China Harbour, Dangote Group and Lagos State Government to redesign a section”of the project where a three-kilometre bridge might be replaced with backfilling across a non-flowing lagoon.”Umahi also highlighted other challenges affecting the project, including a shrine located on the project corridor, which has caused minor delays. Umahi said the shrine must be removed, adding that he would personally intervene if the community failed to do so.

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleFG Sets Dec. 12–17 to Open First Section of Lagos–Calabar Coastal Highway
Next Article Nigeria’s Lagos State Expands Housing Push Amid Rising Urban Demand
Dejo Richards
  • Website

Related Posts

Top 10 CEOs behind Nigeria’s best-performing stocks in 2025

January 13, 2026

Lagos boosted creative economy with N8.4bn

January 13, 2026

FG proposes ₦142 billion for six national bus terminals in 2026 budget 

January 13, 2026
Leave A Reply Cancel Reply

Our Picks

Top 10 CEOs behind Nigeria’s best-performing stocks in 2025

January 13, 2026

Ruto makes 8 new appointments

January 13, 2026

Lagos boosted creative economy with N8.4bn

January 13, 2026

FG proposes ₦142 billion for six national bus terminals in 2026 budget 

January 13, 2026
  • Facebook
  • Twitter
  • Instagram
  • YouTube
Don't Miss
About
About

AfrocaribbeanTv is dedicated to celebrating African and Caribbean culture through media. We promote diverse values and showcase vibrant lifestyles, aiming to inspire, inform, and connect communities worldwide.

Facebook X (Twitter) Instagram YouTube
Popular Posts

Top 10 CEOs behind Nigeria’s best-performing stocks in 2025

January 13, 2026

Ruto makes 8 new appointments

January 13, 2026

Lagos boosted creative economy with N8.4bn

January 13, 2026
News Letter

Subscribe to Updates

Get the latest creative news from AfroCaribbeanTv about achievers in art, design, business, etc.

Copyright © 2025. Designed for AfrocaribbeanTv.
  • Home
  • Lifestyle
  • Leisure
  • Business
  • Buy Now

Type above and press Enter to search. Press Esc to cancel.