Close Menu
AfroCaribbean Tv
  • Home
  • Live TV
  • Live Radio
  • Blog
  • General
  • Africa
    • Nigeria
    • AutoBiography
    • Lifestyle
  • Caribbean
    • Trinidad and Tobago
  • About
  • Contact
Facebook X (Twitter) Instagram
Saturday, December 13
  • Lifestyle
  • General
  • Business
Facebook X (Twitter) LinkedIn VKontakte
AfroCaribbean Tv
Banner
  • Home
  • Live TV
  • Live Radio
  • Blog
  • General
  • Africa
    • Nigeria
    • AutoBiography
    • Lifestyle
  • Caribbean
    • Trinidad and Tobago
  • About
  • Contact
AfroCaribbean Tv
Home » Blog » FG temporarily opens 47km stretch of Lagos–Calabar coastal highyway
General

FG temporarily opens 47km stretch of Lagos–Calabar coastal highyway

Dejo RichardsBy Dejo RichardsDecember 13, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The 47-kilometre stretch runs from the Ahmadu Bello Way junction in Victoria Island to the Eleko junction.The road was temporarily opened on Friday after a ceremony attended by David Umahi, minister of works; Gbolahan Lawal, Oniru of Iruland; Barinada Mpigi, the chairman of senate committee on works; Dany Abboud, managing director of Hitech construction company; Oluwaseun Osiyemi, Lagos commissioner for transportation; and officials of the ministry of works.

Olufemi Dare, federal controller of works in Lagos, said the government decided to temporarily open the section to ease traffic congestion during the Yuletide season.Dare said the 47km section of the Lagos-Calabar coastal road was awarded to Hitech construction company for N1,067,887,381,148.61.He said the contract sum covered the “construction of rigid pavement dual-carriage highway with accompanying drainages and culverts, median barriers, street lightings, and the relocation of public utilities like electric cables, poles, cable ducts, gas and water pipelines as required

The stretch of the Lagos-Calabar Coastal Highway that falls entirely within the Lagos State border is 103km in length,” he said.Advertisement“Up till date, a total of 30km of continuously reinforced concrete pavement (CRCP) has been completed, while sand filling has been completed on the remaining 17.474km, and the whole stretch of 47.474km is thus motorable.

The total stretch in section 1 is projected to be completed before the end of the second quarter of 2026.”Speaking during the ceremony, the works minister said it is untrue that the federal government is only concentrating on the Lagos-Calabar coastal road, adding that other projects are currently being executed.He added that the federal government is ready to accept constructive criticism about the project.

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleFG temporarily opens 47km stretch of Lagos–Calabar coastal highyway
Dejo Richards
  • Website

Related Posts

Sanwo-Olu unveils rehabilitated 1m-gallon water facility

December 13, 2025

Africa’s richest man gives quarter of his wealth to foundation

December 12, 2025

Cardoso launches new era for agric financing, inaugurates ACGSF board

December 11, 2025
Leave A Reply Cancel Reply

Our Picks

FG temporarily opens 47km stretch of Lagos–Calabar coastal highyway

December 13, 2025

FG temporarily opens 47km stretch of Lagos–Calabar coastal highyway

December 13, 2025

Afreximbank announces US$1.1 million donation to aid hurricane Melissa recovery efforts in Jamaica and Haiti

December 13, 2025

Sanwo-Olu unveils rehabilitated 1m-gallon water facility

December 13, 2025
  • Facebook
  • Twitter
  • Instagram
  • YouTube
Don't Miss
About
About

AfrocaribbeanTv is dedicated to celebrating African and Caribbean culture through media. We promote diverse values and showcase vibrant lifestyles, aiming to inspire, inform, and connect communities worldwide.

Facebook X (Twitter) Instagram YouTube
Popular Posts

FG temporarily opens 47km stretch of Lagos–Calabar coastal highyway

December 13, 2025

FG temporarily opens 47km stretch of Lagos–Calabar coastal highyway

December 13, 2025

Afreximbank announces US$1.1 million donation to aid hurricane Melissa recovery efforts in Jamaica and Haiti

December 13, 2025
News Letter

Subscribe to Updates

Get the latest creative news from AfroCaribbeanTv about achievers in art, design, business, etc.

Copyright © 2025. Designed for AfrocaribbeanTv.
  • Home
  • Lifestyle
  • Leisure
  • Business
  • Buy Now

Type above and press Enter to search. Press Esc to cancel.